Head-to-head Meridian-7 (14.5 percent unlevered IRR) vs. Borealis-LEO ($1,240,400,000 10-yr CapEx, $34,038,000 self-insurance savings, 8.9 percent IRR).
A 72-satellite LEO constellation can generate more than twice the EBITDA of a GEO HTS satellite and still deliver a far lower unlevered IRR. Here is the exact CapEx replenishment, self-insurance, and ITU Resolution 35 math.
Worked in full in The Satellite Finance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
As modeled side by side in The Satellite Finance Handbook, Meridian-7 (120 Gbps GEO HTS, 15-year life) and Borealis-LEO (72 LEO satellites across 6 planes, 5-year life, FCC 5-year deorbit rule) obey completely different capital physics:
| Financial & Operational Metric | Meridian-7 (GEO HTS) | Borealis-LEO (72-Sat LEO) |
|---|---|---|
| Initial Asset CapEx (Year 0) | $368,250,000 (incl. L+1) | $680,000,000 (self-insured) |
| Replenishment CapEx (Years 5 to 10) | $0 (15-yr orbital life) | $560,400,000 ($93,400,000/yr) |
| Stabilized Annual EBITDA | $78,692,373 (76.6 percent) | $176,000,000 (64.0 percent) |
| Post-Year-5 Annual FCF (Pre-Tax, Yrs 6 to 10) | $68.6M to $74.1M (Yrs 6 to 10) | $82,600,000 (-53.1% drag) |
| Unlevered Project IRR | 14.5 percent (15-yr after-tax) | 8.9 percent (10-yr pre-tax) |
Explore ECA debt sizing in satellite project finance, OECD export credit, and DSCR sizing, review space insurance waterfalls in satellite launch insurance, CTL triggers, and loss-payee waterfalls, and model both GEO and LEO live in the free Satellite Project Finance & Constellation Stress Model (Excel).
Greenfield LEO networks lack single-asset commercial L+1 insurance, require all-or-nothing multi-launch deployment ($680M on Borealis-LEO) before continuous service begins, face strict ITU Resolution 35 and FCC milestone cliffs, and incur heavy 5-year replenishment CapEx ($560.4M in Years 5 to 10) that competes directly with senior debt service.
Following initial 90-day Bringing Into Use (BIU) within the 7-year regulatory period, Resolution 35 requires deploying 10 percent of notified satellites within 2 years, 50 percent within 5 years, and 100 percent within 7 years, or facing proportional reduction of MIFR spectrum rights.
Usually no. While dedicated physical transponders often trigger ASC 842 embedded lease accounting, pooled software-defined HTS Gbps contracts without a physically distinct identified asset generally remain off-balance-sheet service contracts under ASC 606.
This guide is drawn from The Satellite Finance Handbook, following commercial satellites and constellations from ITU/FCC licensing and spacecraft contracting through space insurance, OECD export credits, debt sizing, and orbital restructurings.