Financing $260,110,483 of fuel at 6.15 percent vs. 8.75 percent WACC ($6,762,873/yr savings), ASC 842 vs. FERC AI19-1-000, and Section 45U PPA math.
A single 1,150 MWe reactor ties up $260 million in capitalized nuclear fuel across FERC Accounts 120.1 through 120.5. Here is how Nuclear Fuel Trusts save $6.76 million per year against utility WACC, how ASC 842 reconciles with FERC, and how IRC Section 45U interacts with hyperscale data-center PPAs.
Worked in full in The Nuclear Fuel Finance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
Because front-end procurement begins 24 months before reactor load and three batches reside simultaneously in the core for 54 months, Seneca Unit 1 carries $260,110,483 in steady-state nuclear fuel investment: $156,406,989 net in-core (Account 120.3 gross $312,813,978 minus Account 120.5 accumulated amortization $156,406,989), $78,203,494 work-in-process (Account 120.1), and $25,500,000 strategic U3O8 buffer (Account 120.2).
Funding that $260,110,483 balance through a bankruptcy-remote Nuclear Fuel Trust SPE (Seneca Nuclear Fuel Trust I) backed by commercial paper and a bank revolver at 6.15 percent instead of an 8.75 percent regulated pre-tax WACC (260 bps spread) cuts annual financing cost from $22,759,667 to $15,996,795, saving $6,762,873 per year ($0.73/MWh). While FASB ASC 842 brings fuel leases onto GAAP balance sheets, FERC Docket No. AI19-1-000 preserves cost-of-service ratemaking neutrality as fuel amortizes monthly into FERC Account 518 ($69,514,217/yr).
Explore front-end SWU math in nuclear fuel cycle cost, SWU math, and optimal tails assay, uranium term contracts and sanctions in uranium term contract collars and the 2028 Russian ban, and model your own utility fuel balance live in the free Nuclear Fuel Cycle Cost and Contract Model (Excel).
A 1,150 MWe PWR like Seneca Unit 1 ties up roughly $260.1 million in steady-state nuclear fuel investment across net in-core assemblies ($156.4M), 24-month pipeline WIP ($78.2M), and a 300,000 lb strategic U3O8 buffer ($25.5M).
No. While ASC 842 requires recognizing fuel-lease Right-of-Use assets and liabilities on GAAP balance sheets, FERC Docket No. AI19-1-000 confirmed that ASC 842 adoption does not automatically alter cost-of-service ratemaking, preserving the 260 bps WACC financing arbitrage ($6.76M/yr).
At the 2025-2026 gross receipts threshold of $26.00/MWh and $15.00/MWh maximum Prevailing Wage credit, the 80 percent reduction phases the Section 45U credit down to exactly $0.00/MWh at $44.75/MWh.
This guide is drawn from The Nuclear Fuel Finance Handbook, following commercial nuclear fuel from uranium mining and enrichment physics through term contracts, Nuclear Fuel Trusts, FERC accounting, Section 45U, and HALEU project finance.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Nuclear Fuel Cycle Cost and Contract Model (Excel).