Free Excel Templates

Port Concession Bid and Project Finance Model (Excel)

An unlocked institutional workbook for container and bulk terminal concessions: 25-year bid NPV, fixed rent vs. variable royalty and MVG penalties, MRA & Handback reserves, DSCR/LLCR/PLCR debt sizing, PAB/TIFIA/PIDP uplift, and Year 5 termination payouts.

Before submitting a binding port concession tender or underwriting non-recourse terminal debt, test whether your bid NPV survives a trade downturn, MVG shortfall penalties, Year 12 crane overhauls, and 1.35x DSCR lender floors. This standalone Excel model runs every calculation dynamically with Controls = 0.

Get the Excel port concession model

One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.

Port_Concession_Bid_and_Project_Finance_Model.xlsx (26 KB)

Unsubscribe in one click. How your address is used.

The handbook behind this model

Built directly from The Port Concession Handbook, covering World Bank Landlord governance, OSRA 2022, EU Directive 2014/23/EU, demand forecasting, crane CapEx, MVG bidding, dry bulk Take-or-Pay, DSCR/LLCR debt sizing, PAB/TIFIA stacks, IFRIC 12, and lender step-in rights.

Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook

Related guides: port concession project finance debt sizing, container terminal concession fees and MVG bidding, and dry bulk Take-or-Pay concessions and IFRIC 12.

Questions practitioners ask

What does the Port Concession Bid and Project Finance Model include?

Six unlocked tabs: README, Assumptions (with a 3-scenario selector for Base, Downside Stress, and Public-Private Stack), Bid_and_Operating_Model (25-year TEU, tariff, OpEx, MVG, bid NPV, IFRIC 12 amortization, and MRA/Handback reserves), Debt_and_Termination (18-year debt, DSCR, LLCR, PLCR, DSRA, Levered IRR, and Year 5 termination payouts), Sensitivity_Matrix, and Controls = 0.

Are there any macros or circular references?

No. Every tab is unlocked, macro-free, separates blue user inputs from black formulas, and verifies Controls = 0.