An unlocked institutional workbook for run-of-river refurbishments, non-powered dams, and conduits: hydraulic power, P50/P90 energy yield, 1 MW/5 MW statutory cliffs, DOE Section 247 grants, post-OBBBA Section 48E ITC transfers, and P90 DSCR debt sizing.
Before spending development equity on FERC licensing or submitting a refurbishment bid, test whether your river hydrology clears 1.20x P90 DSCR, realistic $200/kW-year O&M, and post-OBBBA tax credit math. This standalone Excel model runs every calculation dynamically with Controls = 0.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Small_Hydro_Feasibility_and_Project_Finance_Model.xlsx (18 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Small Hydropower Handbook, covering 10-bin flow-duration curves, low-head Pit-Kaplan selection, FERC 10 MW exemptions and 40 MW conduit exclusions, CWA Section 401 waivers, Part 12D dam safety, PURPA Order No. 872, post-OBBBA 48E/45Y credits, and P90 project finance.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: FERC small hydro licensing and CWA Section 401, low-head hydro refurbishment and CapEx economics, and small hydro P90 project finance and tax credits.
Six unlocked tabs: README, Assumptions (with a 3-scenario selector for Base, Dry/Merchant Stress, and 50% Domestic Content Upside), Hydraulics_and_Yield (with 1 MW PWA and 5 MW PURPA flags), CapEx_Tax_and_Debt (DOE grant, 48E ITC transfer, P50/P90 debt sizing, DSRA), Sensitivity_Matrix, and Controls = 0.
No. Every tab is unlocked, macro-free, separates blue user inputs from black formulas, and verifies Controls = 0.