# The Utility Wildfire Risk Handbook: Companion Files

Julian R. Sterling. Companion page: https://julianrsterling.com/utility-wildfire-risk/

1. **Sierra_Valley_Electric_Wildfire_Case_Workbook.xlsx**: Complete 8-tab Excel case workbook reproducing Sierra Valley Electric Company ($24.00 billion rate base, $2,080 million AB 1054 cap, $3,150 million physical hardening at 51.27 hardening RSE plus $250 million tech = $3,400 million total WMP, $143.0 million/yr self-insurance savings, $4,400 million Pine Ridge Fire loss waterfall, $1,500 million AAA securitization saving $499.3 million NPV, FFO-to-Debt stress from 16.99 percent to 13.23 percent and 11.87 percent) and Cascade Basin Power Corp., with dynamic Controls = 0.
2. **Utility_Wildfire_Risk_and_Credit_Model.xlsx**: Standalone 6-tab Utility Wildfire Risk and Credit Stress Model with a 3-scenario selector (Prudent, Capped + WEMA Lag, Uncapped Distress), closed-form BBB- equity cure, securitization true-up, 3x3 sensitivity matrix, and Controls = 0.

Blue cells are inputs, black cells are formulas, zero macros, unlocked. Education only, not legal, regulatory, tax, or investment advice.
