In 2026, the IRS inflation adjustment factor of 2.0570 lifts the Section 45Y Clean Electricity Production Credit to 3.1 cents per kWh (3.72 cents stacked additively). Here is the exact 10-year math comparing Section 45Y PTC against Section 48E ITC net of IRC Section 50(c) basis reduction and permanent 100 percent bonus depreciation.

Worked in full in The Section 45Y Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →

Official 2025 and 2026 Section 45Y Rates and Additive Stacking

In The Section 45Y Handbook, every statutory calculation is worked on a fictional 150 MW AC onshore wind project, Red Mesa Wind I ($240,000,000 CapEx, $228,000,000 5-year MACRS basis, 42.0 percent P50 capacity factor producing 551,880 MWh annually). Under IRC Section 45Y(c)(3), the 1.5-cent statutory 5x PWA rate multiplies the IRS Inflation Adjustment Factor (1.9971 in 2025; 2.0570 in 2026) and rounds to the nearest 0.1 cent (while the 0.3-cent base rate rounds to the nearest 0.05 cent) before adding bonuses:

Head-to-Head: Section 45Y PTC vs. Section 48E ITC on Red Mesa Wind I

With Public Law 119-21 (OBBBA) permanently restoring 100 percent bonus depreciation under IRC Section 168(k), the IRC Section 50(c) 50 percent ITC basis haircut hits Section 48E immediately in Year 1 ($11,970,000 cash tax penalty), while Section 45Y requires zero basis reduction:

Tax Benefit Metric (8.0% Discount Rate)Section 45Y PTC (1.20x)Section 48E ITC (50.0%)
Gross Credit (10-Yr Nominal / Upfront)$229,802,832$114,000,000
Credit Present Value (at 8.0%)$151,698,040$105,555,556
IRC 50(c) Basis Reduction$0 (0.0 percent)$57,000,000
Year 1 100% Bonus MACRS Shield (21%)$47,880,000$35,910,000
Total Tax Benefit Present Value$196,031,374$138,805,556

On Red Mesa Wind I, Section 45Y beats Section 48E by $57,225,818, with an exact breakeven capacity factor of 26.16 percent. Next, review Section 45Y bonus adders, PWA penalties, and OBBBA PFE rules, compare Section 6418 transferability, Section 6417 Direct Pay, and partnership flips, and run your own project live in the free Section 45Y Credit and Monetization Calculator (Excel).

Questions practitioners ask

What is the Section 45Y credit rate per kWh in 2026?

At the official 2026 IRS Inflation Adjustment Factor of 2.0570, the base rate is 0.6 cents/kWh and the 5x PWA rate is 3.1 cents/kWh. Adding both Energy Community (+10%) and Domestic Content (+10%) additively lifts the 2026 rate to 3.72 cents/kWh ($37.20/MWh).

Do Energy Community and Domestic Content bonuses compound multiplicatively under Section 45Y?

No. Under IRC Section 45Y(g)(11)(A), the 10 percent Domestic Content bonus applies to the subsection (a) amount without the Energy Community bonus, producing a 1.20x total multiplier rather than 1.21x.

When does Section 45Y PTC beat Section 48E ITC?

On a $1,600/kW facility at an 8.0 percent discount rate, Section 45Y beats a 50 percent Section 48E ITC whenever net capacity factor exceeds 26.16 percent (aided by zero depreciable basis reduction vs. IRC 50(c)'s 50 percent ITC haircut).

Read the full handbook

This guide is drawn from The Section 45Y Handbook, following clean electricity facilities from emissions qualification and OBBBA PFE screening through Section 45Y vs. 48E election, Section 6418 transfers, Direct Pay, and Form 7211 filing.

Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks