Book · Julian R. Sterling

The Grid-Enhancing Technologies Handbook

Dynamic Line Ratings, Advanced Conductors, and Power Flow Controls: Economics, Regulation, and Deployment

Buying for your firm? Add your company name and VAT number at checkout and they go on the invoice. For a team: team license, up to 10 people, $59.99 · firm-wide license, $139.99.

About the book

Cover of The Grid-Enhancing Technologies Handbook

Grid-Enhancing Technologies sit at the intersection of high-voltage thermal physics, Kirchhoff power-flow rebalancing, FERC transmission ratemaking, NERC reliability compliance, and project finance. This handbook gives transmission planners, utility CFOs, renewable and data-center developers, and regulators one rigorous quantitative and operational playbook.

Every calculation is worked on two fictional cases: the Redwood 230 kV Corridor operated by Cascadia Transmission Company, LLC (DLR 6.98x BCR / $52,958,977 NPV, APFC+TO +120.0 MW firm, ACCC reconductoring +300.0 MW and $946,824/yr avoided losses, Stacked GETs $72,159,019 NPV vs. Greenfield -$85,778,653, and 30.63x Averch-Johnson CapEx bias solved by 20.0 percent Shared Savings) and Alder Ridge Renewables, LLC ($139,475,023 FERC Order 2023 NPV lift and +255 bps IRR boost).

Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.

PDF edition, $19.99, DRM-free, delivered at once by email.

Paperback, $32.99 PDF edition, $19.99

What is inside

Free companion files

Unlocked Excel workbooks, blue inputs, black formulas, zero macros, zero circular references, and a Controls tab that reads 0.

Download all files (ZIP)43 KB

Start with 00_START_HERE.md.

Want the standalone screening tool first? Open the free GETs Corridor Economics and Deployment Model (Excel) page.

Worked articles from the book

Questions practitioners ask

Who is this handbook written for?

Transmission planners, utility regulatory and finance teams, renewable and data-center developers, infrastructure investors, and energy attorneys evaluating Dynamic Line Ratings, advanced conductors, modular SSSC power-flow controls, and Topology Optimization.

Does it cover FERC Orders 881, 2023, and 1920 alongside NERC compliance?

Yes. It covers FERC Order 881 hourly AAR and RM24-6 DLR, Order 2023 mandatory ATT evaluations with a worked developer IRR case, Order 1920 20-year right-sizing, FERC AI20-1-000 software capitalization, Shared-Savings incentives, Ofgem Totex, and NERC FAC-008-5, TPL-001-5.1, PRC-023, and CIP-002/005.

Are the Excel GETs economics workbooks included free?

Yes. Both Redwood_Corridor_GETs_Case_Workbook.xlsx and the standalone GETs_Corridor_Economics_and_Deployment_Model.xlsx are free on this page, unlocked, and macro-free with Controls = 0.

Also by Julian R. Sterling