An unlocked institutional workbook for long-duration energy storage: active reservoir volume physics, IRC Section 48E / 6418 ITC monetization, merchant vs. tolling EBITDA, DOE LPO Title 17 debt sizing, and 40-year LCOS vs. 10-hour LFP BESS.
Before spending millions on FERC preliminary permits or deep geotechnical boreholes, test whether your candidate ridge or abandoned open-pit mine clears 40-year LCOS against 10-hour lithium-ion batteries and supports 25-year project finance debt. This standalone Excel model runs every calculation dynamically with Controls = 0.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Pumped_Storage_Hydro_Economics_and_Sizing_Model.xlsx (18 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Pumped Storage Hydropower Handbook, covering hydraulic sizing, DFIM electromechanical design, FERC closed-loop licensing, CWA Section 401, Order 2023 interconnection, revenue stacking, utility tolling, FIDIC Emerald Book tunneling risk, IRC 48E/6418 tax credits, and DOE LPO Title 17 debt.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: pumped storage hydro economics and 40-year LCOS, FERC closed-loop licensing and CWA 401, and revenue stacking, tolling, and DOE LPO project finance.
Six unlocked tabs: README, Assumptions (3-scenario selector for Greenfield Base, Tunneling Stress, and Brownfield Mine), Sizing_and_Economics (reservoir volume, post-ITC CAPEX, EBITDA, DSCR debt sizing), LCOS_vs_BESS (40-year comparison with battery augmentations), Sensitivity_Matrix, and Controls = 0.
No. Every tab is unlocked, macro-free, separates blue user inputs from black formulas, and verifies Controls = 0.