Pumped storage hydropower anchors long-duration grid reliability, synchronous inertia, and black-start restoration across fifty-year asset lives. This handbook gives developers, utilities, infrastructure funds, lenders, and counsel one rigorous quantitative and regulatory playbook.
Every calculation is worked on two fictional cases: Granite Basin Pumped Storage Project, developed by Granite Basin Storage Holdings, LLC with a 25-year Capacity and Tolling Agreement with Cascadia Grid Resources, Inc. (400 MW / 10.0 hr, $1,300,000,000 all-in CAPEX reduced to $858,400,000 net post-ITC, $121,800,000 merchant EBITDA vs. $83,200,000 contracted tolling EBITDA, $600,880,000 DOE Title 17 debt at 1.86x DSCR and 15.6 percent pre-tax, post-ITC Equity IRR, $116.14/MWh 40-year LCOS vs. $132.59/MWh 10-hour LFP BESS, and 10.2 percent pre-tax IRR under a $125,000,000 tunneling shock) and Red Mesa Pit Pumped Storage (150 MW brownfield mine saving $130,875,000 all-in CAPEX).
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.
PDF edition, $19.99, DRM-free, delivered at once by email.
Introduction: Why Pumped Storage Hydropower Is the Anchor of Long-Duration Grid Storage
Chapter 1: Long-Duration Energy Storage Fundamentals and Grid Need
Chapter 2: Site Screening, Hydraulic Head Physics, and Reservoir Sizing
Chapter 3: Electromechanical Design: Fixed-Speed, Variable-Speed (DFIM), and Ternary Units
Chapter 4: Capital Cost Engineering, Civil Works, and Greenfield vs. Brownfield Budgets
Chapter 5: FERC Hydropower Licensing: Preliminary Permits, ILP, and the AWIA 2-Year Track
Chapter 6: Clean Water Act Section 401, ESA Consultation, and Dam Safety (18 CFR Part 12)
Chapter 7: Grid Interconnection Under FERC Order 2023 and Transmission Strategy
Chapter 8: Wholesale Market Participation (FERC Order 841) and Energy Arbitrage Math
Chapter 9: Capacity Markets, Ancillary Services, and Full Revenue Stacking
Chapter 10: Long-Term Tolling Agreements, Utility Procurement, and Merchant-to-Contracted Trade-Offs
Chapter 11: Levelized Cost of Storage (LCOS) and Head-to-Head Valuation vs. 10-Hour BESS
Chapter 12: Underground Construction Risk, Geotechnical Baseline Reports, and FIDIC Emerald Book
Chapter 13: Federal Tax Credits (IRC 48E), Section 6418 Transferability, and 20-Year MACRS
Chapter 14: Project Finance Debt Sizing: DOE LPO Title 17 vs. Commercial Bank Debt
Chapter 15: Asset Management, Refurbishment Cycles, M&A Valuation, and Governance
Conclusion: Building Bankable 50-Year Storage Infrastructure
Appendix A: Practitioner Glossary of Pumped Storage Hydropower
Appendix B: Worked Hydraulic, LCOS, Tax, and Project Finance Formulas
Appendix C: Site Screening, FERC Licensing, GBR, and Lender Due Diligence Checklists
Appendix D: Companion Excel Workbooks Guide
Free companion files
Unlocked Excel workbooks, blue inputs, black formulas, zero macros, zero circular references, and a Controls tab that reads 0.
Complete case model
Granite Basin PSH Case Workbook
8 tabs reproducing hydraulic reservoir physics, bottom-up CAPEX, IRC 48E/6418 tax credits, merchant vs. tolling EBITDA, DOE LPO vs. commercial bank debt, 40-year LCOS vs. 10-hour BESS, tunneling stress, and Red Mesa Pit brownfield economics.
Energy infrastructure developers, private equity sponsors, utility IRP planners, project finance lenders, engineers, and attorneys developing, valuing, or financing long-duration pumped storage hydropower.
Does it compare pumped storage LCOS against 10-hour lithium-ion batteries?
Yes. It runs a full 40-year head-to-head LCOS comparison at 7.00 percent WACC showing Granite Basin Pumped Storage Project at $116.14/MWh versus $132.59/MWh for an equal-capacity 10-hour LFP battery with Year 12, 24, and 36 pack replacements.
Are the Excel pumped storage financial models included free?
Yes. Both Granite_Basin_PSH_Case_Workbook.xlsx and the standalone Pumped_Storage_Hydro_Economics_and_Sizing_Model.xlsx are free on this page, unlocked, and macro-free with Controls = 0.