An unlocked institutional workbook for municipal utilities, advisors, and P3 sponsors: WIFIA + CWSRF + Title XVI + Direct Pay optimization, IRC 148(d) DSRF, PFAS stress matrix, DBFOM VfM, GASB 94 liability, and industrial reuse DSCR/LLCR.
Before issuing $240 million in sewer revenue bonds or signing a 30-year DBFOM P3, test your capital stack across WIFIA 49%/80% statutory caps, CWSRF subsidization, PFAS biosolids shocks, and GASB 94 balance-sheet impacts. This standalone Excel model runs every check dynamically with Controls = 0.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Wastewater_Project_Finance_and_SRF_Model.xlsx (18 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Wastewater Treatment Project Finance Handbook, covering NPDES permitting, capital budgeting, BABA/AIS cross-cutters, municipal bond indentures, CWSRF, EPA WIFIA, DBFOM P3s, GASB 94, Title XVI water reuse, biogas Section 6417 Direct Pay, and private BOO project finance.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: CWSRF and WIFIA blended financing stacks, wastewater P3 DBFOM and Value for Money, and water reuse project finance and PFAS stress tests.
Six unlocked tabs: Setup_Inputs (with a 3-scenario selector for Base, PFAS/Rate Stress, and Upside Grant/EC), Blended_Stack_Optimizer (WIFIA, CWSRF, Title XVI, Sec. 6417 Direct Pay, Senior Muni, IRC 148(d) DSRF), P3_and_VfM_Calculator (DBFOM Availability Payment, VfM, GASB 94), Reuse_and_Industrial_PF (MGD-to-AF, DSCR, LLCR), Stress_Matrix, and Controls = 0.
No. Every tab is unlocked, macro-free, separates blue user inputs from black formulas, and verifies Controls = 0.