Modern wastewater treatment and water reuse projects demand institutional project finance discipline across municipal bond indentures, state revolving funds, federal WIFIA credit, P3 availability payments, and private industrial offtake contracts. This handbook gives practitioners one rigorous, end-to-end quantitative and statutory playbook.
Every calculation is worked deterministically on two fictional cases: Cedar Creek Water Reclamation Facility, owned by Cedar Creek Regional Sanitation Authority ($240,000,000, 30.0 MGD ADF, 62,500 ERUs, saving $44,441,029 in PV with Stack B vs. Stack A, holding 1.34x DSCR in a $3,600,000 PFAS biosolids shock, and evaluating $53,968,725 DBFOM VfM with $286,602,981 GASB 94 liability) and Mesa Verde Industrial Water Reuse Facility ($66,000,000, 6.0 MGD BOO, 1.74x base / 1.15x floor DSCR, 1.74x LLCR, 21.1 percent levered IRR).
Paperback, $32.99, shipping included to the United States, the United Kingdom, Europe, and Australia.
PDF edition, $19.99, DRM-free, delivered at once by email.
Conclusion: Disciplined Capital Structuring for Next-Generation Water Infrastructure
Appendix A: Practitioner Glossary of Wastewater Project Finance
Appendix B: Worked Formulas and Quantitative Reference
Appendix C: Utility, CWSRF/WIFIA, P3, and Lender Due Diligence Checklists
Appendix D: Companion Excel Workbooks Guide
Free companion files
Unlocked Excel workbooks, blue inputs, black formulas, zero macros, zero circular references, and a Controls tab that reads 0.
Complete case model
Cedar Creek Wastewater Case Workbook
8 tabs reproducing CCRSA operating pro forma, Stack A vs. Stack B WIFIA/CWSRF/Title XVI/Sec. 6417 optimization, IRC 148(d) DSRF, PFAS sensitivity matrix, Stack C DBFOM VfM and GASB 94, Mesa Verde BOO non-recourse IRR, and Controls = 0.
Municipal utility CFOs, public finance investment bankers, municipal advisors, infrastructure private equity sponsors, non-recourse project finance lenders, bond counsel, and owner's engineers.
Does it cover WIFIA, CWSRF, DBFOM P3s, GASB 94, and PFAS biosolids risk?
Yes. It compares All-Municipal Bonds, Blended WIFIA + CWSRF + Title XVI + IRC Section 6417 Direct Pay, and DBFOM Availability Payment P3s head-to-head, including GASB 94 liabilities, IRC Section 142(a)(5) PABs, and PFAS biosolids DSCR stress testing.
Are the Excel wastewater project finance models included free?
Yes. Both Cedar_Creek_Wastewater_Case_Workbook.xlsx and the standalone Wastewater_Project_Finance_and_SRF_Model.xlsx are free on this page, unlocked, and macro-free with Controls = 0.